Doxford Engineering, Panel Replacement, Leeds

LV Panel and UPS Module Replacement

The £1.1m construction of replacement LV switchgear, Uninterruptable Power Supply System and generator controls.  All works conducted in a live operational 24/7 environment, with building load transfer operations conducted over out of hours during agreed shut-down periods.

Services

  • Cost Management
  • Quantity Surveying
  • Engineering Services Cost Consultancy